Fibrosis describes a pathological stiffening of organs or tissues that is caused by the increased synthesis of extracellular proteins. Fibrosis severely impairs organ function and may occur in…
Building 5: Laboratory Building
Laboratory building 5 is linked to the administrative building as well as to laboratory building 1 via a glass staircase and an overpass. The building was erected in…
Laboratory building 5 is linked to the administrative building as well as to laboratory building 1 via a glass staircase and an overpass. The building was erected in 1993 but structurally changed…
Building 3: Laboratory Building
Building 3 is the eastern part of the building complex "Westflügel" which was built by the IMET in 1953 directly at the Beutenbergstraße. The building is…
Building 3 is the eastern part of the building complex "Westflügel" which was built by the IMET in 1953 directly at the Beutenbergstraße. The building is partly used by the HKI as…
The Laboratory Building was opened in 2013 and is FLI's new landmark. The bright, spacious and open architecture follows the road and welcomes visitors at the FLI.
Here you can find:
the…
The Laboratory Building was opened in 2013 and is FLI's new landmark. The bright, spacious and open architecture follows the road and welcomes visitors at the FLI.
Here you can find:
the…